Archive for March 17, 2018

Painting the Town… Update (17/3/18)


I’ve spent longer than I expected to on this piece in the studio today. Just showing that even with all the material I have to hand. I began by sourcing the longest box (when flattened out) which measured to just over a meter. Thinking that I may have the tallest plinth on my hands here. As the day progressed I was searching for pieces that matched the original box. I couldn’t, settling for two varied sizes, which ultimately took the height down to just under a meter.

With the height fixed I began to get the pieces cut to size, slowly in place and fixed together. There are support strips of card on either side of the with some of the sheets that are forming the plinth. I have to make do and carry on the best I can with some pieces. Once in place I began to reinforce with the standard triangles on the 90 degree angles, it was the those of around 120 degrees that needed a different approach to ensure they did the same job.

As I’ve had with the other plinths, the model miniature slotted in with ease once more, allowing me to see it raised and supported. All I need to do now is add the gum tape for extra strength before pairing it up with the other piece. I’m glad that all four plinths have been constructed, bringing me a step closer to drawing this piece to an end. Moving forward I want to see how this pair looked when projecting together too. Before that happens I need to buy more kit that will streamline what I already have, making further tests and ultimately installations an easier process to set-up. Lastly I need to see how the projections work with both the viewfinder in place and without. I’m also concerned how it will look  alongside the others which have so far not needed one. All these decisions still to make.

Advertisements